• ه ط / ٢١٧
    تصميم وإنشاء وصيانة تقاطعات وجسور على طريق النويصيب

    RA / 217
    Design, Construction and Maintenance
    of Interchanges and Bridges
    At Nawaseeb Road

Project Data

Contract:

RA/217 – Design, Construction and Maintenance of Interchanges and Bridges at Nawaseeb Road

Employer:

Ministry of Public Works of the State of Kuwait - Road Administration

Consultant:

Parsons Brinckerhoff International in association with the Gulf Consult

Contractor:

The Arab Contractors - Osman Ahmad Osman & Co.

Contract Price:

169,500,000 KWD

Time for Completion:

1,080 Days

Commencement Date:

18 April 2017

Completion Date:

1 April 2020



The present contract is the Fixed Lump Sum, Design & Build Contract
Contract Price 169,500,000 KWD.
  • Refurbishment/reconstruction of the 45 kilometres of six lane dual carriageway (three in each direction) with a provision of the space for future upgrade with addition of one lane in each direction – hence completion of eight lane motorway (four in each direction) for the State of Kuwait will be eventual output of the Project.
  • Construction of 9 interchanges at grade separated junctions, which include 18 elevated three lane bridges and 1 elevated two lane vehicular flyover. All these comprise 13 km of motorway on reinforced earth ramps and pertaining retaining walls.
  • Each bridge will have one additional lane, separated by barriers. This technical detail will allow converting bridges from three to four lane structures, which will allow the future widening of the motorway without additional structural works on the bridge.
  • 4 elevated Camel Crossings with 3 km of roadways on reinforced earth ramps and associated retaining walls
  • construction of storm water drainage system, landscaping and irrigation works, construction of the storm water drainage system.
  • Implementation of traffic diversions in close coordination with the Ministry of Interior – Traffic Police.
  • Maintenance of uninterrupted traffic on the traffic diversions during the construction.
  • Removal of existing and construction of new bituminous pavements, installation of the traffic control system including road marking and traffic signs and safety barriers.
  • Complete protection of existing sanitary pipelines.
  • Complete relocation of existing water, electrical and telecom lines.
  • Complete reconstruction of existing street lighting system.
  • Relocation of existing electrical networks inclusive high, medium and low tension underground and overhead electrical power lines.
  • Complete relocation and protection of existing various oil pipelines.

Project Team

Employer

Public Authority for Road and Land Transport

Consultant

Parsons Brinckerhoff International

Consultant

Gulf Consult

Contractor

The Arab Contractors
Osman Ahmad Osman & Co.




Project Timeline Entries

Timeline

Contract Formalized in early April 2017 with agreed commencement date of 18 April 2017.

Construction will take about 3 years

Traffic Diversions will be implemented from September 2017 til March 2020

Construction of the Bridges, Camels Crossings and Associated Mechanically Stablized Earth Retaining Walls will be carried out from February 2018 to April 2020

Construction of Roads, Culverts, Street Lighting System, Utility Services Plant and Crossings along with the Gas, Oil, Petrol and Water pipelines, Strom Water Drainage System, and Soft & Hard Landscaping elements will be carried out thorough March 2018 to April 2020

Contact Us

Hamad Al Mubarak Street, Block 83, Plot 12,
Monira Building (Opposite French School), 2nd & 5th Floor Salmiya, Kuwait
(+965) - 2 571 2870

Google Map Location

Nawaseeb Road Project